Cutting Edge Core Drilling, Inc.

Sample the Sampling

Home
Tooling
Sample of the Sampling
Packer Preview
Project Resume

08sampletypes.jpg

 

We will approach most standard soil sample borings with continuous sampling to 10 feet. The borings will then be advanced on 5-foot increments for the next appropriate sample depth. Hollow stem augers or casing is applied upon the necessary soil conditions.

Our crews can log and process samples on site per client request. Shelby tubes and split spoons samplers are extracted on site, labeled, logged and placed into ziplock baggies.

NQ2 / HQ / CP cores are site extracted, labeled, logged, and bagged up. Each core run will have a sample bagged up every two feet.