The wire line packers are installed through the NQ or HQ system and may be placed with ease at any location with in the cored bore hole. Most find that completing the bore hole and then upon exiting the bore hole packer tests are applied at the specified depths.




comp2.JPG

Process for packer deployment:

* Configure packers above ground and field test packers.
* Calibrate water meter to ensure water flow quantities.
* Install NQ or HQ seal adapter with pressure gauge.
* Install packers after field tests are QA.
* Inflate packers
* In chorus with packer inflation, water will fill the NQ or HQ pipe.
* Auxiliary pump is then started and brought to pressure.